Gulf oilfield supply to the Bakken — Houston to Williston, drilling and production equipment on heavy-haul configurations.
The Houston-to-Bakken corridor moves oilfield equipment from the Gulf supply base to the North Dakota play: drilling components, production iron, and field equipment that runs heavy enough to need RGN or multi-axle. It's a high-rotation lane in active drilling cycles.
The permit stack crosses several states north out of Texas, and the winter window on the northern end can tighten routing. We pull the per-state permits and run the route survey before quoting so the timeline and cost reflect the real operation, not an optimistic estimate.
Yes — Houston to the Bakken is a core oil-and-gas heavy-haul lane. Drilling components, production equipment, and field iron move on RGN or multi-axle configurations with the multi-state permit stack priced into the quote.
Heavy haul · RGN / multi-axle · 3–5 days (permit-dependent). A named coordinator quotes it the same day.