Cat D8 dozer
- Equipment
- RGN — 4-axle heavy haul
- Transit
- 4 days door to door
Permits cleared in 5 states + Alberta. Zero claims. Customer rebooked the lane within 60 days.
Cat D8 to Calgary. Transformer to Lagos. Wind blade across the Mexican border. Refinery column to Cartagena. The work, lane by lane — what we moved, how we routed it, and how it came out.

Permits cleared in 5 states + Alberta. Zero claims. Customer rebooked the lane within 60 days.
Engineered route from Houston to Port of Houston. Break-bulk vessel via Tin Can Island. Inland trucking through partner network to substation. Customer cleared paperwork pre-arrival.
Oversize permits filed in TX, TX-MX crossing, Tamaulipas, and Nuevo León. Bilingual coordination at Laredo crossing. Customer's wind farm install schedule held.
Equipment dismantled into 4 ocean-shippable modules. Sea legs via Charleston → Antofagasta. Destination assembly coordinated through Chilean partner. Site delivery photo-confirmed.
Route surveyed and engineer-stamped through 3 Texas counties. Police escort coordinated. Vessel chartered for break-bulk single load. Spanish-language customs filing in Cartagena. On-time delivery to refinery site.
Heavy haul · oversize · ocean · cross-border. Real loads, real lanes.